For this healthcare HVAC project, we provided mechanical design and installation for 360 tons of mechanical cooling. We also designed and implemented a building automation system for 138 zones including critical environments such as operating suites, labs, oncology, radiation, pathology and pharmacy.
The project included mission-critical cooling for a linear accelerator, CT-Scans and MRIs; specialized high-purity airflow with HEPA exhaust systems; and medical gas and alarm systems.
GENERAL CONTRACTOR
McCarthy Construction