IFS upgraded the building automation systems in multiple buildings for the Camdenton R-III School District in Camdenton, MO. Our scope of work for this project included equipment, labor, and materials to replace outdated building automation systems.
The customer’s existing building automation system (BAS) was outdated and not functioning properly. They were unable to receive adequate service and support for their existing systems, and contacted IFS for assistance.
Total Equipment Controlled
- 36 Rooftop Unit with new Reliable Controls
- 4 Rooftop Units with BACnet Integration
- 10 Air Handlers with Reliable Controls
- 2 Power Plants with Reliable Controls and BACnet Integration
- Over 270 Reliable Zone Controllers
Additionally, during the Retro-Commissioning phase of the project, IFS discovered several energy saving opportunities including:
- Variable Frequency Drives (VFDs) for Fans
- Variable Frequency Drives (VFDs) for Pumps
- Plant Optimization